Water Line work is continuing from NW Lyman Rd. to NW Seaman St. The replacement of pavement in Lyman Rd. is anticipated for May 18 with Lyman Road reopened to traffic tentatively on May 23. Water main installation will continue on the west side of NW Tyler from Seaman St. to NW Beverly St. and residents will continue to be able to access their driveways from Tyler St. until the water main installation from Lyman Rd. to Beverly St. is completed.
by sproutweb | May 11, 2022 | Uncategorized | 0 comments